Time required to get electricity (days)
Files | Size | Format | Created | Updated | License | Source |
---|---|---|---|---|---|---|
1 | 59.3 kB | csv | over 6 years ago |
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is neces...
Read more
Data Files
File | Description | Size | Last modified | Download |
---|---|---|---|---|
data | 59.3 kB | over 6 years ago | data |
Data Previews
Indicator data
Schema
name | type | description |
---|---|---|
Country Name | string | Country or Region name |
Country Code | string | ISO 3-digit ISO code extended to include regional codes e.g. EUR, ARB etc |
Year | year | Year |
Value | number | Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure. |
Time required to get electricity is the number of days to obtain a permanent electricity connection. The measure captures the median duration that the electricity utility and experts indicate is necessary in practice, rather than required by law, to complete a procedure.